Trade listing
Uptime telescopic gangway
Two motion-compensated personnel gangways available. Aluminium telescopic bridge on a slew tower, with operator cabin and hydraulic power pack.
2Units available
19.4 mMid-stroke length
1.2 mWalkway width
25 tTotal weight
01 — Units
Available
Uptime SN 00x and Uptime 00y
Uptime telescopic gangway
SN 00x and 00y
15.4 m min · 23.4 m max
19.4 m mid-stroke · normal area ±2 m
19.35 m ± 4 m
Minimum 1.2 m wide
+20° / −15°
2 kN/m²
7,200 kg
17,800 kg, incl. HPU and slew
25,000 kg
690 V · 275 kVA
Operational features
- Motion-compensated telescopic bridge for personnel transfer to a vessel or installation
- Operator cabin on the slew tower. Manual mode locks all axes when the controls are released
- Free-float mode once landed, so the bridge follows relative motion. Landed weight can be reduced from the panel
- Connected limits: telescopic speed up to 4 m/s, vertical speed up to 2.5 m/s
- Support cone with shock absorber at the landing end. Cone can be lashed for a long connection
- Telescope driven by hydraulic motors on a pitch rack, guided on steel rollers
- Stair at the outer end. Side netting. Expanded-metal floor
- Aluminium structure to NS-EN 1090-3. Steel to NORSOK System 1, Sa 2.5
- Structural design verified by DNV